PROJECTS

EPCM Services For West To East Pipeline (WEP) Project

Project Brief:

The objective of this pro¡ect is to provide drafting support for the preparation, updat-ing, and finalization of engineering draw-ings across multiple disciplines, in accor-dance with ENPPI's internal standards and ADNOC CAD manual requirements.

Scope of Work:

The scope of work includes provid-ing drafing support to engineering teams for the preparation, updat-ing, and finalization of technical drawings across multiple engineer-ing disciplines. All work will be carried out in accordance with established CAD standards, proce-dures, and approved templates.
Drafing activities will primarily be performed from DIAR's o±ce, unless otherwise agreed with the client.

Key Aspects of the ADNOC W P Project:
Purpose: Boost oil transport capability, posi-tioning Fu¡airah as a key trading hub and enabling export directly from offshore fields (Das, Zakum, and Umm Lulu).

Location: Spans five emirates, running from Jebel Dhanna terminal to Fu¡airah.

Status: The pro¡ect involves multiple sections, including a 300 km, 48-inch pipeline for Section 1 and a 198 km, 48-inch pipeline for Section 2.

Components: Includes storage tanks, pump-ing stations, and associated power/control upgrades.

Timeline: EPCM services and site work have been active, with developments ongoing in the Jebel Dhanna area

The ADNOC Onshore West to East Pipe-line (WEP) is a crucial 520 km crude oil pipeline project in the UAE connecting Jebel Dhanna in the west to Fujairah Port on the eastern coast. It allows ADNOC to transport offshore oil directly to the coast, enhancing strategic export capabil-ities and reducing security risks by bypassing the Strait of Hormuz.