Project Brief:

Nesma, acting as the contractor on behalf of ARAM-CO—the pro¡ect owner under Job Order BI-10-01883 (ABQAIQ & NORTH GHAWAR OIL FACILITIES PROJ-
ECTS)—has invited Diar to participate in the as-built documentation phase of the pro¡ect. This initiative encompasses the upgrade of the existing Salt/Pro-duced Water In¡ection Systems at ABGOSP-2 and ABGOSP-5, as well as the implementation of a new Sea Water In¡ection System at ABGOSP-5, designed to fulfill the water in¡ection requirements of the Abqaiq field through 2037.

Scope of Work:

Diar Consulting Group (Diar) shall issue the as-built drawings based on redline drawings in accordance with Saudi Aramco As-Built Procedures and the iPlant Uploading Process. The following deliverables and requirements apply:

All deliverables shall be controlled and issued to the contractor in accordance with the Engineering Document List (EDL).

All deliverables must be stamped and transmitted by Diar Consulting Compa-ny (DCC).So° copy and PDF versions of redline drawings shall be issued as a complete package to the contractor.

In accordance with the SOW, the contractor shall provide full support until all as-built drawings and documents are successfully uploaded to the iPlant system.

Engineering tag correlation files for all disciplines under Job Order BI-10-1883 are within the vendor's scope.

All document upload activities shall comply with Saudi Aramco Engineering